Excavation Contractors Longbridge

Find the best Excavating Contractors in Longbridge

Receive up to 3 Excavation Contractors quotes for your project today! Compare profiles, reviews, accreditations, portfolio, etc... and choose the best offer.

Service Needed
City or Town
Find Pros
  • E
    1
    Birmingham, GB

    Get Quote
  • Durolas (Contractors) Ltd
    1
    95 Frances Road, Kings Norton, Birmingham, B30 3DU, GB

    About Durolas (Contractors) Ltd Durolas (Contractors) Ltd was incorporated on October 4th, 1947, and operated from offices on Gas Street, Birmingham, with yards in Grosvenor Street West and Anderton Street. We have the undisputed claim that our company laid the first zebra crossing in Birmingham for the city corporation. This information was featured in the True North Books Limited, ‘More Birmingham Memories’ book. A Local Company With An Excellent Reputation Since October 1st, 1962, Durolas (Contractors) Limited has operated from their offices and yard in the Kings Norton area of Birmingham. The company is very well established, having operated for over 70 years and has a wide client base including Health Authorities, Local and Regional Councils, Education Authorities, Industrial and Commercial Business’s and can offer a very diverse service ranging from a single pothole repair to a complete surfacing project for car parks, roadways, and pedestrian areas. Durolas is approved by the following SSIP bodies: Achilles, CHAS, Safe Contractor, Altius, and Constructionline. We are members of Birmingham Health Safety Environment Association (BHSEA), the British Standards Institute (BSI), and the Logistics UK formerly known as the Freight Transport Association. Where practicable materials goods and services are purchased from suppliers who can demonstrate good Sustainability and socially ethical performances, preferably certified by a UKAS registered body/organisation or similar third party. Wherever possible preference is given to locally sourced materials as the Company is committed to promoting local enterprise and is a committed member of the Birmingham social charter as we feel that this has positive, environmental, social and economic benefits for the local community. We believe that ensuring the best principles of ethical and sustainable procurement demonstrates our commitment to comply with current Environmental and Social Legislation as well as helping to build a sustainable supply chain and manage risk reputation. All Management, Staff, and Employees hold enhanced DBS verifications as well as pertinent trade-related qualifications. We can therefore give assurance that we carry out our undertakings in a manner that exceeds all existing requirements as laid down in relevant Health, Safety and Environmental Regulations. The Company has been structured to provide our Clients with the assurance that we carry out all of our undertakings to the highest standards and in accordance with all relevant legislation.

    Get Quote
  • Furey C J Construction Ltd
    3.4
    678, Pershore Road, Birmingham, B29 7NR, GB

    CJ Furey Construction Ltd is a leading groundworks, civil engineering & construction company operating throughout the UK. Our expertise range from groundworks and civil engineering, through to principal contractor services. Foundation solutions, site infrastructure, concrete and external works form a significant part of our delivery, but it is our attention to detail, value for money, adherence to deadlines and investment in staff, training and plant, upon which the company has built its enviable reputation. Our flexible, “can-do” approach has allowed us to build strong and stable relationships with our clients who include local authorities, RSLs, private companies, leading retailers and larger construction companies. C.J. Furey Construction consistently delivers projects ahead of programme and to the very highest standard, resulting in repeat business and word of mouth recommendations.

    Get Quote
  • Ke
    3.7
    Birmingham, GB

    Get Quote
  • Th
    5
    Birmingham, GB

    Get Quote
  • Wi
    3
    Birmingham, GB

    Get Quote
  • T
    1
    Birmingham, GB

    Get Quote
  • PM
    5
    Birmingham, GB

    Get Quote
  • Av
    1
    Birmingham, GB

    Get Quote
  • JN
    1
    Birmingham, GB

    Get Quote

Over 11,537+ Excavation Contractors in our network

Our excavation experts operate in Longbridge & surrounding areas!

ExcavationHQ has curated and vetted Top Excavation Companies near Longbridge. Find the most trustworthy contractor today.

Frequently Asked Questions About Excavation Contractors

Find answers to common questions about excavation contractors and hiring excavation professionals in the UK.

What is the difference between cut and fill excavation?

Cut and fill excavation is a technique for balancing earthwork volumes on a site:
Cut: Involves excavating soil from an area where the existing grade is higher than the desired grade.
Fill: Refers to using the excavated soil ('cut' material) to raise the grade in an area where the existing grade is lower than desired.
This method minimizes the need to import or export soil, reducing costs and environmental impact. It's commonly used for site preparation, road construction, and landscaping.

How do I choose the right excavation contractor for my project?

Selecting the right excavation contractor is crucial for a successful project. Here are key factors to consider:
  • Project Type and Size: Ensure the contractor has experience handling projects similar to yours in scale and complexity.
  • Reputation and Reviews: Check online reviews and testimonials, and request references from previous clients.
  • Licensing and Insurance: Verify that the contractor is properly licensed and insured to protect you from liability.
  • Equipment and Resources: Confirm that they have the necessary equipment and resources for your project's needs.
  • Communication and Transparency: Choose a contractor who communicates clearly, provides detailed estimates, and keeps you informed throughout the project.
  • Safety Record: Inquire about their safety protocols and track record to ensure a safe work environment.
  • Price: While price is important, it shouldn't be the only deciding factor. Balance affordability with experience, reputation, and quality of service.
By carefully evaluating these factors and comparing multiple contractors, you can make an informed decision.

How long does an excavation project take?

The duration of an excavation project varies significantly depending on factors like:
  • Project Size and Scope: Larger, more complex excavations naturally take longer.
  • Soil Conditions: Rocky or challenging soil types can slow down progress.
  • Site Accessibility: Limited access might require more time for maneuvering equipment and hauling materials.
  • Weather: Inclement weather can cause delays.
  • Permitting and Inspections: Waiting for permits or inspections can extend the timeline.
Your excavation contractor can provide a more accurate estimate after assessing your project's specifics.

What are the different types of excavation?

Excavation encompasses various types, each with its purpose and method. Some common types include:
  • Topsoil Removal: Stripping the fertile topsoil layer from a site, often preserving it for landscaping.
  • Trench Excavation: Digging long, narrow trenches for utilities (pipes, cables) or foundations.
  • Basement Excavation: Removing earth to create a space for a basement beneath a structure.
  • Pool Excavation: Digging a precise hole for installing a swimming pool.
  • Roadway Excavation: Removing earth and preparing the ground for road construction.
  • Demolition Excavation: Clearing debris and preparing the site after demolition.
  • Channel Excavation: Creating channels for drainage or irrigation.
The specific type of excavation required depends on the project's goals and site conditions.

What is the difference between cut and fill excavation?

Cut and fill excavation is a technique for balancing earthwork volumes on a site:
Cut: Involves excavating soil from an area where the existing grade is higher than the desired grade.
Fill: Refers to using the excavated soil ('cut' material) to raise the grade in an area where the existing grade is lower than desired.
This method minimizes the need to import or export soil, reducing costs and environmental impact. It's commonly used for site preparation, road construction, and landscaping.

How do I choose the right excavation contractor for my project?

Selecting the right excavation contractor is crucial for a successful project. Here are key factors to consider:
  • Project Type and Size: Ensure the contractor has experience handling projects similar to yours in scale and complexity.
  • Reputation and Reviews: Check online reviews and testimonials, and request references from previous clients.
  • Licensing and Insurance: Verify that the contractor is properly licensed and insured to protect you from liability.
  • Equipment and Resources: Confirm that they have the necessary equipment and resources for your project's needs.
  • Communication and Transparency: Choose a contractor who communicates clearly, provides detailed estimates, and keeps you informed throughout the project.
  • Safety Record: Inquire about their safety protocols and track record to ensure a safe work environment.
  • Price: While price is important, it shouldn't be the only deciding factor. Balance affordability with experience, reputation, and quality of service.
By carefully evaluating these factors and comparing multiple contractors, you can make an informed decision.

How long does an excavation project take?

The duration of an excavation project varies significantly depending on factors like:
  • Project Size and Scope: Larger, more complex excavations naturally take longer.
  • Soil Conditions: Rocky or challenging soil types can slow down progress.
  • Site Accessibility: Limited access might require more time for maneuvering equipment and hauling materials.
  • Weather: Inclement weather can cause delays.
  • Permitting and Inspections: Waiting for permits or inspections can extend the timeline.
Your excavation contractor can provide a more accurate estimate after assessing your project's specifics.

What are the different types of excavation?

Excavation encompasses various types, each with its purpose and method. Some common types include:
  • Topsoil Removal: Stripping the fertile topsoil layer from a site, often preserving it for landscaping.
  • Trench Excavation: Digging long, narrow trenches for utilities (pipes, cables) or foundations.
  • Basement Excavation: Removing earth to create a space for a basement beneath a structure.
  • Pool Excavation: Digging a precise hole for installing a swimming pool.
  • Roadway Excavation: Removing earth and preparing the ground for road construction.
  • Demolition Excavation: Clearing debris and preparing the site after demolition.
  • Channel Excavation: Creating channels for drainage or irrigation.
The specific type of excavation required depends on the project's goals and site conditions.